Purpose: Preserve the minimal memorable set of Forge meetings, how they are delivered (human-only, hybrid, Versona-assisted), and what accountability requires—without inventing a parallel taxonomy. Meeting is the primary public term. This document extends ceremonies-prescriptive.md (inputs, outputs, agendas) with delivery modes, decision ownership, and anti-patterns.
Scrum as memory aid: Forge uses a similar shape (short daily sync, time-boxed planning, review, retro, gate) but does not copy Scrum mechanics verbatim—see iteration language (Ore → Ingot → Spark → Charge) in process-and-flows.md.
Charge: Meetings are not modeled as items insideCharge. Charge is today’s selected Sparks; the daily syncconfirms Charge—see daily/README.md.
Artifacts & decisions: How durable artifacts, owners, and meetings connect across PDLC/SDLC — ARTIFACT-AND-DECISION-MODEL.md.
1. Meeting delivery modes
Meetings use delivery modes, not separate object types:
Mode
Meaning
Human-only
Facilitation and accountable decisions are human-led in the room or on a live call.
Hybrid
Humans in the loop; Versonas prepare drafts, checklists, or §5-shaped discipline passes that humans review and sign.
Versona-only
Session used to prepare, simulate, synthesize, or draft (e.g. async package before a human sign-off). Not a substitute for human accountability on binding decisions—see §6.
2. Recommended meeting set (lean default)
Meeting
In default cadence?
Refinement (Ore → Ingot)
Yes
Planning (Ingot → Sparks)
Yes (iteration start)
Daily sync
Yes (every working day; short)
Review (inspect increment + evidence posture)
Yes (iteration end)
Assay Gate (release decision)
Yes when a release candidate exists
Retrospective
Yes (regular, iteration end)
Ad hoc decision meeting
Only when real decision pressure exists—not a standing weekly slot
Ore intake remains continuous, not a scheduled meeting.
3. Refinement vs Planning
Question
Answer
Default
Refinement is its own meeting. Different primary question: shape what is plannable (Ore → Ingot) vs commit how much and which Sparks (Planning).
Conditional merge
Very small teams or very low Ore throughput may use one combined calendar block (“Planning + refinement”) only if Ingots still satisfy Definition of Readybefore Sparks are committed—you merged the schedule, not the gate.
Never
Treating refinement as always part of Planning—this collapses backlog shaping into scope commitment and invites thrash.
4. Meeting matrix (delivery modes)
Meeting
Trigger / cadence (lean)
Timebox (typical)
Human-only
Hybrid
Versona-only
Refinement
1× weekly (2× if Ore flow is high)
≤ 1 h
✓
✓
✓ (draft; Ingot promotion human-signed)
Planning
Start of 1-week iteration
≤ 2 h
✓
✓
✓ (decomposition drafts; scope human-signed)
Daily sync
Every working day
15 min
✓
✓
⚠ prefer assistant, not sole chair
Review
End of iteration
≤ 1.5 h
✓
✓
✓ (prep; readiness human)
Assay Gate
When candidate + evidence package ready
≤ 30 min
✓
✓
✓ (checklist; release human)
Retrospective
End of iteration
≤ 1 h
✓
✓
✓ (themes; experiments human-owned)
Ad hoc decision
Decision pressure only
30–90 min
✓
✓
✓ (options; decision human)
Daily sync: Versona-only is a poor fit as the team event; use Versona to support a human-led standup, or stay human-only when presence is required.
5. Per-meeting specification
Each subsection uses the same field names. Inputs means tracking-spine material (Ore, Ingots, Charge, logs)—not a separate “artifact object” taxonomy.
5.1 Refinement (Ore → Ingot)
Field
Detail
Name
Refinement
For what
Turn selected Ore into Ingots plannable with clear acceptance and evidence expectations.
Why
Without shaping, Planning commits guesses; rework rises.
Primary decision question
Which Ore becomes an Ingot (ready), merged, Banked, or rejected—and on what terms?
Trigger / cadence
Standing: 1× weekly (2× if intake is heavy).
Suggested timebox
≤ 1 h; ~10–15% iteration capacity on refinement over the week.
Allowed delivery modes
All three; Versona-only may draft Ingots; human signs promote/Bank/reject.
Required participants
Product hat (R), Engineering hat (R), Challenge hat (O — Versonas at decision points).