Software development lifecycle (SDLC)

This describes a generic delivery flow and which documentation to update at each step. It pairs with DOCUMENTATION-STRUCTURE.md (where files live, including the optional milestone → epic → story → task hierarchy in §2.1) and your project’s own requirements or backlog convention (where you keep epics, stories, and IDs).

PDLC (product lifecycle): This SDLC covers how to build the product right — phases A–F from requirements through release. The Product Development Life Cycle (blueprints/pdlc/) covers building the right product — problem discovery, solution validation, strategy, go-to-market, growth, and sunset. SDLC phases A–F sit inside the PDLC as the Build & Release engine. See PDLC-SDLC-BRIDGE.md for phase alignment, artifact handoffs, role mapping, and a worked example.

Methodology depth (Scrum, Kanban, XP, phased, Lean, Spiral, V-Model, DevOps, SAFe, FDD, Crystal, DSDM, Shape Up, DA, BDD, RAD, Agile, agentic SDLC): see methodologies/README.md — full guides with external links and adoption notes.

Ceremonies (foundation vs forks): methodology-neutral intent types (why recurring collaboration exists) and per-methodology mappings — methodologies/ceremonies/README.md.

Bridge (intents ↔ Scrum / Kanban / phased / XP names): methodologies/ceremonies/methodology-bridge.md — matrix, blend suggestions, calendar mapping.

Discipline bridges: Cross-cutting disciplines each have a bridge mapping their practices to SDLC phases A–F and PDLC P1–P6 — see BRIDGES.md for the full index, or jump to a specific discipline: BA · PM · Testing · Architecture · DevOps · Big Data · Data Science.

Path examples below use a common docs/ layout; adjust names if your tree differs.


1. Roles (can be one person)

Role Responsibility
Owner Prioritizes work breakdown / backlog; accepts epic or story done.
Implementer Implements work items; updates specs, backlog, and traceability as agreed below.

Deeper (methodology-neutral): delivery archetypes (demand, build, flow, assurance, governance), how Scrum / Kanban / phased / XP map titles onto them, and how that relates to Contributor in engineering tracking — see methodologies/roles-archetypes.md.


2. Phases & documentation obligations

Ceremony intents vs phases (C1–C6)

Recurring collaboration (ceremonies) should cover the six intent types over time: C1 Align, C2 Commit, C3 Sync, C4 Inspect, C5 Improve, C6 Assure/release — see methodologies/ceremonies/ceremony-foundation.md. They do not replace the artifact tables below; they explain why teams hold planning, reviews, and gates.

Phase Intents most engaged (typical) Illustrative ceremony pressure Detail
A Discover C1, C2 Prioritization, roadmap/backlog sessions Phase A
B Specify C1, C6 (readiness) Refinement, “definition of ready,” risk triage Phase B
C Design C1, C6 Design review, NFR alignment Phase C
D Build C2, C3, C6 (ongoing) Pull/commit selection, standups, CI as assurance Phase D
E Verify C3, C4, C6 Test progress sync, stakeholder demo, quality gates Phase E
F Release C4, C6 Go/no-go, release approval, post-release learnings → C5 Phase F

Methodology mapping: the same intents appear as Sprint Planning, replenishment, tollgates, planning game, etc. — methodologies/ceremonies/methodology-bridge.md.


Phase A — Discover / prioritize

Activities: Ideas, rough sizing, ordering.

Artifacts (typical)

Artifact Action
Planning source of truth One place for prioritized work (WBS/CSV, backlog, board, or optional high-level docs/ROADMAP.md from templates/ROADMAP.template.md). Record where it lives in docs/PROJECT.md or root README.md.
Work breakdown (WBS) e.g. docs/requirements/WBS.csv — new epics/stories or statuses such as draft / backlog.
Spec files under your milestone tree Optional until you commit to build.

Exit: A backlog item is ready to specify when it has a clear outcome and a home in the WBS (or equivalent).


Phase B — Specify

Activities: Acceptance criteria, edge cases, dependencies, risks.

Artifacts (typical)

Artifact Action
Story (or feature) spec status: ready when acceptance criteria are agreed.
Risk register e.g. docs/requirements/risks/register.csv — add or update rows when scope changes risk.
Themes / tags matrix e.g. docs/requirements/traceability/themes-matrix.csv if you use themes.

Exit: Story (or equivalent) is ready; implementation tasks can be split.


Phase C — Design (lightweight)

Activities: Enough design to implement without rework; record durable decisions only when useful.

Artifacts (typical)

Artifact When
Epic/story body Sketches, interfaces, UX notes in the same spec.
ADRs e.g. docs/adr/ — when a choice is hard to reverse or affects multiple modules.
Architecture notes e.g. docs/architecture/ when subsystems or data flow need a shared picture.

Exit: No blocking unknown for this scope remains undocumented.


Phase D — Build

Activities: Implementation, tests, local verification.

Artifacts (typical)

Artifact Action
Task-level notes Link requirement or task IDs in commits or PR descriptions when useful.
WBS / backlog Set items to in_progress when work starts.
API / public surface Language-appropriate doc comments (e.g. KDoc, Javadoc, Rustdoc, docstrings).
CI pipeline config e.g. .github/workflows/, GitLab CI, Jenkinsfile — lives in-repo; document what runs and merge/release gates in docs/development/ (or equivalent). See §7.
Optional agents & automation When blueprints/agents/ is adopted: container recipes (e.g. browser/E2E) in agents/; document image build and recipe steps beside other CI gates. Broader agentic practices: methodologies/agentic-sdlc.md. See DOCUMENTATION-STRUCTURE.md and the agents blueprint.
Test plan (lightweight) For non-trivial scope: outline scope, levels (unit/integration/e2e/manual), and exit criteria — story spec, docs/testing/, or templates/TEST-PLAN.template.md.

Exit: Acceptance criteria met; tests added or skip justified in the story/PR.


Phase E — Verify

Activities: Automated tests, manual checks, regression of related behavior.

Artifacts (typical)

Artifact Action
Tests ↔ requirements e.g. docs/requirements/traceability/tests-matrix.csv, or inline references in tests.
Quality gates (CI) Pipeline must pass agreed checks (build, lint/static analysis, tests) before merge or release — documented in docs/development/ (see §7).
Story spec status: done when verified.

Exit: Story done; backlog row matches reality; CI reflects the same bar as local verification unless a temporary exception is recorded (story/PR).


Phase F — Release

Activities: Versioning, packaging, distribution, compliance checks.

Artifacts (typical)

Artifact Action
docs/release/ (or equivalent) Checklists, privacy / compliance links, signing notes (no secrets in repo).
Root README.md User-visible features if changed.
Planning / milestone status Updated to reflect what shipped (wherever you track it).
Release CI (optional) Tag/build pipelines, store upload, or signing orchestration — secrets in CI vault, not in Git; document process in docs/release/ or docs/development/.

Exit: Artifact published to the intended distribution channel (app store, registry, fleet, etc.); status docs updated.


3. Definition of Done (story or equivalent)

A story is done when:

  1. Acceptance criteria in the spec are met (or explicitly waived with reason).
  2. The canonical backlog (e.g. WBS) marks the story done.
  3. Tests: New logic has automated coverage or a documented exception.
  4. CI: Required pipeline checks pass for the merged change (or a documented waiver by Owner).
  5. Risks: Risk register updated if mitigation shipped or risk closed.
  6. User-facing changes: Product README or UI copy reviewed if applicable.

4. Definition of Done (epic or equivalent)

An epic is done when all in-scope child stories are done, your planning view reflects completion, and residual risks are accepted or closed.


5. Change control

  • Requirement IDs (if used) stay stable once referenced in code, tests, or ADRs; deprecate with a note rather than silent renumbering.
  • Scope management: Scope changes show up in the backlog/WBS (or equivalent)—prefer explicit new stories/tasks over hidden scope. Descoping is explicit (cancelled/deferred); epics close when in-scope children are done. Risks update when scope shifts materially.
  • Time and effort: Git activity shows when work touched the repo, not duration or billable hours. Explicit time (if needed) lives in a tracker or agreed in-repo log — see project sdlc/TRACKING-FOUNDATION.md when present.
  • ADRs: Prefer supersede with a new ADR over deleting history.

See the change management process for diagram, tables, and links to tracking docs.


6. Review cadence (suggested)

Cadence Activity
Per change request / PR Touch backlog/specs when scope or status changes.
Weekly / end of milestone Planning/backlog accuracy, open risks, README freshness.
Before major release Release checklist, privacy/compliance docs, signing process (documented, not secret values).

7. CI/CD, quality gates, and test plans

CI/CD means continuous integration (build + checks on every push/PR) and, when you adopt it, continuous delivery or deployment (automation toward release).

Testing depth: disciplines/engineering/testing/README.md is the cross-cutting testing knowledge base — test levels and types, test design techniques, modern strategies (shift-left, TDD, BDD, contract testing, AI-augmented), and the test automation frameworks landscape. Reference it when choosing what to test and which tools to use; this section covers where testing fits in the pipeline.

Concept What to capture
Pipeline Where it lives (e.g. .github/workflows/), which branches trigger it.
Quality gates Mandatory steps: e.g. compile, lint/static analysis, unit tests, dependency/license scan — document the list so “green” matches team expectations.
Test plan For meaningful scope: what to test (levels, environments), who runs manual/exploratory checks, and done criteria — use a story spec section or templates/TEST-PLAN.template.md.
Traceability Keep tests ↔ requirements links in your traceability matrix or in code as your project prefers.
Optional automation images If blueprints/agents/ is present: same recipe should pass locally (container) and in CI unless waiver is documented.

Merge policy (suggested): No merge to the main branch while required CI checks are failing, unless Owner explicitly accepts risk and a waiver is noted in the PR or story.

Release policy (suggested): No release artifact from automation until the same (or stricter) gates pass on the release commit/tag; add release-only checks (e.g. ProGuard, signing) as the product matures.

Where to write details: docs/development/ (or your dev guide) — not in blueprints/sdlc/ except this generic section.


Keep product-specific context in docs/PROJECT.md (or equivalent), not in this file.